One bathroom job, drafted from a builder's site photos and notes. The builder and client are made up. The method and the format are exactly what you'd get.

  1. 01

    You send

    Your site photos, the notes you'd scrawl in the ute, and your usual rates.

  2. 02

    It drafts

    Scope by stage, quantities, inclusions, exclusions and a payment schedule, in your format.

  3. 03

    You check and send

    Anything it isn't sure about is flagged for you. You price it, you sign it.

What the builder supplied

The notes, exactly as typed:

wilston qlder bathroom. gut it.
room approx 2.6 x 2.4, ceiling 2.4??
move shower to back wall where bath is
wall hung vanity 900. niche in shower
tiles to ceiling. heated rail
client picking tiles (allow 55/m2)
floor feels soft near bath
old fibro on external wall - test?
window in shower zone
no exhaust fan atm
want done before xmas

And eight photos. Placeholders stand in for them here:

  • P1Room from doorway
  • P2Bath and back wall
  • P3Vanity and existing basin waste
  • P4Floor at bath edge
  • P5Ceiling, no fan
  • P6Window over bath
  • P7External wall sheeting
  • P8Under-house view of joists

What came back: the draft quote

Quotation

Sample Building Co.

QBCC licence no. 0000000 (sample) · ABN 00 000 000 000 (sample)

Quote
Q-0147
Date
22 Oct 2026
Valid
30 days
Site
Wilston QLD
Client
Sample client

Scope of works

Full renovation of the main bathroom, approx. 2.6 × 2.4 m with a 2.4 m ceiling. Strip to frame. Relocate the shower to the back wall in place of the bath. New wall-hung 900 vanity, shower niche, wall tiles to ceiling, heated towel rail and a new ducted exhaust fan.

Works by stage, with quantity, rate and amount
ItemQtyRate $Amount $
1 Strip-out and protection2,550.00
Protect floors and access path1 item380.00
Strip bathroom to frame: tiles, bath, vanity, WC, linings1 item1,650.00
Skip bin, 6 m³1 ea520.00
2 Plumbing (licensed plumber)3,350.00
Rough-in: move shower to the bath wall, new floor waste, vanity and WC points1 item2,400.00
Fit-off and test1 item950.00
3 Electrical (licensed electrician)1,330.00
Exhaust fan, ducted to eave1 ea480.00
LED downlights4 ea at 95.004 ea95.00380.00
Double GPO at vanity, RCD protected1 ea210.00
Heated towel rail point1 ea260.00
4 Carpentry and linings3,465.40
Re-frame wet wall, noggings for fixtures1 item1,100.00
Fibre-cement wet-area sheeting, walls24.0 m² at 58.0024.0 m²58.001,392.00
Compressed sheet floor over existing joists6.2 m² at 85.006.2 m²85.00527.00
Moisture-resistant plasterboard ceiling, set6.2 m² at 72.006.2 m²72.00446.40
5 Waterproofing to AS 37401,226.00
Membrane: floor, and shower walls to 180014.5 m² at 68.0014.5 m²68.00986.00
Puddle flanges, bond breakers, certificate1 item240.00
6 Tiling3,818.00
Floor tiles laid, screed to falls6.2 m² at 140.006.2 m²140.00868.00
Wall tiles to ceiling22.0 m² at 115.0022.0 m²115.002,530.00
Shower niche 600 × 3001 ea420.00
7 Fit-off and finishes2,220.00
Install vanity, mirror, WC, tapware, screen1 item1,350.00
Paint ceiling, door and architraves1 item680.00
Silicone and trims1 item190.00
8 Clean and handover350.00
Builder's clean, handover and walkthrough1 item350.00
9 Supervision1,200.00
Site supervision and project management1 item1,200.00
Works, stages 1–919,509.40

Prime cost items (client selections)

Prime cost allowances
ItemAllowance basisAllowance $
Wall and floor tiles, supply only28.2 m² at $55/m²28.2 m² at $55/m²1,551.00
Wall-hung vanity, 9001 ea1 ea1,200.00
Toilet suite1 ea1 ea650.00
Tapware set1 set1 set900.00
Frameless shower screen1 ea1 ea1,400.00
Heated towel rail1 ea1 ea380.00
Prime cost allowances6,081.00

If a selection costs more or less than its allowance, the difference is adjusted at the builder's agreed margin.

Included

  • ✓ All labour, materials and trades listed above
  • ✓ Waterproofing to AS 3740 with a certificate
  • ✓ Rubbish removal and a builder's clean
  • ✓ Provisional sum of $800 for floor joist repair (see flag 1)

Not included

  • ✕ Asbestos testing or removal
  • ✕ Work outside the bathroom
  • ✕ Window replacement or reveal changes
  • ✕ Client selections above their allowances
  • ✕ Council or certifier fees, if required

Builder to check before sending

  1. 1 · Soft floor (notes, P4, P8). A $800 provisional sum is allowed for joist repair. Confirm it on strip-out and adjust the sum to suit.
  2. 2 · Old fibro (notes, P7). The house looks older than 1990. Treat suspected material as asbestos unless testing confirms otherwise. Resolve assessment and safe handling before any strip-out that could disturb it; testing and removal are excluded from this sample.
  3. 3 · Window in the new shower zone (P6). It will need a waterproofed reveal or an obscure glazing decision. This isn't priced yet.
  4. 4 · Ceiling height (notes say “2.4??”). Wall tile and sheeting areas assume 2.4 m. Measure on site.
  5. 5 · Tile quantity. The 28.2 m² allowance has no wastage. Add about 10% (2.8 m²) if the client is supplying tiles to this number.
  6. 6 · “Before Xmas”. No completion date is promised. Add your own once trades are booked.

Price

Price summary
Works, stages 1–919,509.40
Prime cost allowances6,081.00
Provisional sum800.00
Subtotal, excl. GST26,390.40
GST 10%2,639.04
Total, incl. GST$ 29,029.44

Payment schedule

Payment schedule by stage
StageShareAmount $
Deposit on signing5%1,451.47
Strip-out, rough-ins and framing complete30%8,708.83
Waterproofing certified and tiling complete35%10,160.30
Practical completion30%8,708.84

Set for Queensland: the deposit is capped at 5% where the contract price is $20,000 or more, and each stage claim matches completed work (QBCC rules, checked 20 Nov 2026). This quote isn't the contract. Work of this size needs a QBCC-compliant domestic building contract and Home Warranty cover.

Sample only: Sample Building Co., its licence and ABN, the client and the job are fictional. Rates are illustrative, not a price guide.

Get this set up for your jobs.

A$990 incl. GST, once. It's set up to your format and rates, running in about a week. Half up front, half once you've seen it draft one of your own jobs. Licensed to your business, with no subscription.