Quotation
Sample Building Co.
QBCC licence no. 0000000 (sample) · ABN 00 000 000 000 (sample)
- Quote
- Q-0147
- Date
- 22 Oct 2026
- Valid
- 30 days
- Site
- Wilston QLD
- Client
- Sample client
Scope of works
Full renovation of the main bathroom, approx. 2.6 × 2.4 m with a 2.4 m ceiling. Strip to frame. Relocate the shower to the back wall in place of the bath. New wall-hung 900 vanity, shower niche, wall tiles to ceiling, heated towel rail and a new ducted exhaust fan.
| Item | Qty | Rate $ | Amount $ |
|---|---|---|---|
| 1 Strip-out and protection | 2,550.00 | ||
| Protect floors and access path | 1 item | 380.00 | |
| Strip bathroom to frame: tiles, bath, vanity, WC, linings | 1 item | 1,650.00 | |
| Skip bin, 6 m³ | 1 ea | 520.00 | |
| 2 Plumbing (licensed plumber) | 3,350.00 | ||
| Rough-in: move shower to the bath wall, new floor waste, vanity and WC points | 1 item | 2,400.00 | |
| Fit-off and test | 1 item | 950.00 | |
| 3 Electrical (licensed electrician) | 1,330.00 | ||
| Exhaust fan, ducted to eave | 1 ea | 480.00 | |
| LED downlights4 ea at 95.00 | 4 ea | 95.00 | 380.00 |
| Double GPO at vanity, RCD protected | 1 ea | 210.00 | |
| Heated towel rail point | 1 ea | 260.00 | |
| 4 Carpentry and linings | 3,465.40 | ||
| Re-frame wet wall, noggings for fixtures | 1 item | 1,100.00 | |
| Fibre-cement wet-area sheeting, walls24.0 m² at 58.00 | 24.0 m² | 58.00 | 1,392.00 |
| Compressed sheet floor over existing joists6.2 m² at 85.00 | 6.2 m² | 85.00 | 527.00 |
| Moisture-resistant plasterboard ceiling, set6.2 m² at 72.00 | 6.2 m² | 72.00 | 446.40 |
| 5 Waterproofing to AS 3740 | 1,226.00 | ||
| Membrane: floor, and shower walls to 180014.5 m² at 68.00 | 14.5 m² | 68.00 | 986.00 |
| Puddle flanges, bond breakers, certificate | 1 item | 240.00 | |
| 6 Tiling | 3,818.00 | ||
| Floor tiles laid, screed to falls6.2 m² at 140.00 | 6.2 m² | 140.00 | 868.00 |
| Wall tiles to ceiling22.0 m² at 115.00 | 22.0 m² | 115.00 | 2,530.00 |
| Shower niche 600 × 300 | 1 ea | 420.00 | |
| 7 Fit-off and finishes | 2,220.00 | ||
| Install vanity, mirror, WC, tapware, screen | 1 item | 1,350.00 | |
| Paint ceiling, door and architraves | 1 item | 680.00 | |
| Silicone and trims | 1 item | 190.00 | |
| 8 Clean and handover | 350.00 | ||
| Builder's clean, handover and walkthrough | 1 item | 350.00 | |
| 9 Supervision | 1,200.00 | ||
| Site supervision and project management | 1 item | 1,200.00 | |
| Works, stages 1–9 | 19,509.40 | ||
Prime cost items (client selections)
| Item | Allowance basis | Allowance $ |
|---|---|---|
| Wall and floor tiles, supply only28.2 m² at $55/m² | 28.2 m² at $55/m² | 1,551.00 |
| Wall-hung vanity, 9001 ea | 1 ea | 1,200.00 |
| Toilet suite1 ea | 1 ea | 650.00 |
| Tapware set1 set | 1 set | 900.00 |
| Frameless shower screen1 ea | 1 ea | 1,400.00 |
| Heated towel rail1 ea | 1 ea | 380.00 |
| Prime cost allowances | 6,081.00 |
If a selection costs more or less than its allowance, the difference is adjusted at the builder's agreed margin.
Included
- ✓ All labour, materials and trades listed above
- ✓ Waterproofing to AS 3740 with a certificate
- ✓ Rubbish removal and a builder's clean
- ✓ Provisional sum of $800 for floor joist repair (see flag 1)
Not included
- ✕ Asbestos testing or removal
- ✕ Work outside the bathroom
- ✕ Window replacement or reveal changes
- ✕ Client selections above their allowances
- ✕ Council or certifier fees, if required
Builder to check before sending
- 1 · Soft floor (notes, P4, P8). A $800 provisional sum is allowed for joist repair. Confirm it on strip-out and adjust the sum to suit.
- 2 · Old fibro (notes, P7). The house looks older than 1990. Treat suspected material as asbestos unless testing confirms otherwise. Resolve assessment and safe handling before any strip-out that could disturb it; testing and removal are excluded from this sample.
- 3 · Window in the new shower zone (P6). It will need a waterproofed reveal or an obscure glazing decision. This isn't priced yet.
- 4 · Ceiling height (notes say “2.4??”). Wall tile and sheeting areas assume 2.4 m. Measure on site.
- 5 · Tile quantity. The 28.2 m² allowance has no wastage. Add about 10% (2.8 m²) if the client is supplying tiles to this number.
- 6 · “Before Xmas”. No completion date is promised. Add your own once trades are booked.
Price
| Works, stages 1–9 | 19,509.40 |
| Prime cost allowances | 6,081.00 |
| Provisional sum | 800.00 |
| Subtotal, excl. GST | 26,390.40 |
| GST 10% | 2,639.04 |
| Total, incl. GST | $ 29,029.44 |
Payment schedule
| Stage | Share | Amount $ |
|---|---|---|
| Deposit on signing | 5% | 1,451.47 |
| Strip-out, rough-ins and framing complete | 30% | 8,708.83 |
| Waterproofing certified and tiling complete | 35% | 10,160.30 |
| Practical completion | 30% | 8,708.84 |
Set for Queensland: the deposit is capped at 5% where the contract price is $20,000 or more, and each stage claim matches completed work (QBCC rules, checked 20 Nov 2026). This quote isn't the contract. Work of this size needs a QBCC-compliant domestic building contract and Home Warranty cover.
Sample only: Sample Building Co., its licence and ABN, the client and the job are fictional. Rates are illustrative, not a price guide.